Answer first: Yes, an office building can become apartments in NSW, but it is a change of building use from Class 5 to Class 2, not a fit-out. You usually need a new development application in a zone that allows residential use, a design that meets the Apartment Design Guide, BASIX and the NCC, and registered DBP Act design practitioners for the Class 2 work.
By: giantA Pty Ltd · Updated 18 November 2026
Why are developers looking at converting offices into apartments?
Older, lower-grade office stock is under pressure across Australian cities. In a recent piece for The Urban Developer, Macroplan chief executive Brian Haratsis argued that the move away from CBD offices is structural rather than cyclical, with tough consequences for owners of older buildings (The Urban Developer, 13 November 2026). At the same time, NSW needs more homes close to transport and jobs.
That makes an empty or half-let office building look like an obvious housing site. Sometimes it is. Often, though, the floor plate, structure, façade and services were designed for desks rather than bedrooms, and the cost of making them work for residents decides whether the project stacks up. The planning and building rules below are what turn "obvious" into "viable" or "walk away".
The same thinking applies to approved-but-unbuilt office schemes. In central Geelong, a 2019 office tower approval that never started has been reworked so that most of the planned commercial floorspace becomes around 100 apartments above a smaller office and retail base (The Urban Developer, 17 November 2026). That project is in Victoria, under a different planning system, but it shows the market logic: when office demand softens, owners revisit the use mix before they build.
What actually changes when an office becomes apartments?
Under the National Construction Code (NCC), every building, or part of a building, is classified by its use. The ABCB's building classifications guide describes Class 5 as office buildings used for professional or commercial purposes, and Class 2 as apartment buildings where people live above and below each other in sole-occupancy units. A mixed-use building can hold both, for example retail on the ground floor, offices on lower levels and apartments above.
Moving from Class 5 to Class 2 is a change of building use. That single shift sets off a chain of obligations that do not apply to an office refurbishment:
| Area | Office (Class 5) | Apartments (Class 2) |
|---|---|---|
| Planning | Office premises use under the LEP | Residential use must be permissible in the zone; Housing SEPP Chapter 4 and the ADG apply to conversions of 3+ storeys with 4+ dwellings |
| Building practitioners | Not a regulated building on its own | Regulated building under the DBP Act; registered design and building practitioners required |
| Sustainability | NCC Section J energy provisions | A BASIX certificate is required because the building becomes a BASIX building |
| Fire safety | Fire measures sized for office occupants | Measures for sleeping occupants, separation between units and safe evacuation routes |
| Acoustics | Generally not regulated between tenancies | NCC Part F7 sound insulation between sole-occupancy units |
| Completion | Occupation certificate if consent required | Occupation certificate for the change of use, plus RAB Act completion notice and DBP Act declarations |
Our explainer on what a Class 2 building is covers the classification side in more depth.
Is office-to-residential conversion exempt or complying development in NSW?
Generally, no. The NSW Planning Portal's change of use page lists the exempt changes of use, and they keep within business categories such as office premises, business premises and shops. A change from office to residential is not one of them. As at November 2026 we are not aware of any state-wide exempt or complying pathway for converting offices into apartments, so plan on development consent, and check your council's LEP land use table first. If dwellings or residential flat buildings are prohibited in the zone, the conversion cannot proceed without a planning proposal to change the controls.
Can you modify an approved DA instead of lodging a new one?
This is the first question most owners of an approved office scheme ask, because a modification is usually faster than a fresh DA. Section 4.55 of the Environmental Planning and Assessment Act 1979 lets a consent be modified, but as the City of Parramatta explains, the development must remain substantially the same development as the one originally approved.
Turning a predominantly office building into a predominantly residential one changes the essential character of the development: its use, its occupants, its amenity requirements and its impacts. In practice that usually fails the "substantially the same" test, so expect to lodge a new DA. A modification may still suit smaller adjustments, such as changing one or two upper levels in a mixed-use scheme that already includes residential use, but that is a judgement your planner should make against the actual consent. Our page on modifying a development after approval sets out how we assess this.
Which NSW planning controls apply to the residential design?
Once the use is permissible, the design is assessed like any other apartment proposal, with some flexibility for existing fabric.
- Housing SEPP Chapter 4 and the Apartment Design Guide (ADG). According to NSW Planning's Better apartments page, Chapter 4 and the ADG apply to residential flat buildings, shop top housing and mixed-use development with a residential component that are 3 or more storeys and have 4 or more dwellings, and this expressly includes the conversion of an existing building.
- Design review and verification. NSW guidance on using the ADG notes that the design criteria are examples of how to meet the objectives, not the only way, and that councils should consider whether alternative design measures satisfy the objectives. That matters for conversions, where a deep floor plate or fixed core makes some criteria hard to meet. A qualified designer will also need to provide a design verification statement.
- BASIX. The EP&A Regulation 2021 defines BASIX development to include a change of building use by which a building becomes a BASIX building, meaning a building with at least one dwelling. An office-to-apartment conversion therefore needs a BASIX certificate. See our guide to when BASIX is and is not required.
- Council DCP controls. Parking, waste, communal open space and deep soil controls still apply to the extent the ADG does not override them, and councils will look closely at residential amenity next to retained commercial uses.
How does the DBP Act apply to an office-to-apartment conversion?
The Design and Building Practitioners Act 2020 (DBP Act) applies to building work on a building where the building, or a part of it, is Class 2. NSW Government guidance on building classes and roles under the DBP scheme confirms the Act covers new and existing Class 2 buildings and mixed-use buildings with a Class 2 part, including their other parts such as offices and shops.
The DBP Regulation does exclude some fit-out work, but only where the part becomes Class 5, 6, 9a or 9b because of a change of use. Fit-out that creates apartments is not covered by that exclusion. In practical terms, a conversion needs:
- A registered design practitioner to prepare regulated designs for each building element and performance solution, and sign design compliance declarations that the designs comply with the Building Code of Australia.
- A registered building practitioner to lodge those regulated designs and declarations on the NSW Planning Portal before the building work they cover starts.
- Building compliance declarations and any as-built designs lodged before applying for the occupation certificate.
- The developer to give notice of the planned OC application date under the Residential Apartment Buildings (Compliance and Enforcement Powers) Act 2020 (RAB Act) and pay the building work levy if it applies.
Where the converted building keeps offices or shops on lower levels, those parts are pulled into the DBP Act too, as we explain in our guide to mixed-use Class 2 buildings. For the detail on which elements need regulated designs, see Class 2 regulated designs.
What building issues decide whether a conversion works?
Planning approval is only half of it. These are the technical questions that most often make or break an office conversion.
Fire safety and existing building upgrades
The EP&A Regulation 2021 gives councils two relevant powers. For a change of use with no building work, section 62 says consent cannot be granted unless the council is satisfied the building complies, or will comply on completion, with the Category 1 fire safety provisions for the new use. For a DA that involves rebuilding or altering the building, section 64 requires the council to consider whether the existing building should be brought into total or partial conformity with the Building Code of Australia, for example where the proposed and recent work exceed half the building's volume or the existing fire measures are inadequate. Residents sleep in the building, so expect a closer look at detection and warning systems, sprinklers, fire separation between units and egress. Where the existing building cannot meet the Deemed-to-Satisfy provisions, a fire engineered performance solution may help, and under the DBP Act that becomes a regulated design.
Daylight, ventilation and floor plate depth
Office floor plates are often deep, with a central core and long distances from the façade to the middle of the floor. Apartments need habitable rooms with windows, natural ventilation and solar access under the ADG objectives. The usual design moves are slimmer apartments along the perimeter, cutting a light well or atrium into the floor, or using the deep centre for storage, services and corridors. Each has structural and cost consequences.
Structure, services and plumbing
Every apartment needs a kitchen, bathroom and laundry, which means new drainage and risers through slabs that were never designed for them. Structural engineers will need to check slab penetrations, any new openings and the capacity of existing elements for new loads such as balconies or rooftop plant.
Acoustics between apartments
NCC Part F7 sets sound insulation performance for floors and walls separating sole-occupancy units in Class 2 and 3 buildings. Office slabs and partition walls rarely achieve this without added ceilings, floating floors or new wall systems, and that eats into ceiling height.
Which NCC edition applies?
NSW Government guidance on the NCC states that NCC 2022 (with Amendment 2 from 29 July 2025) is currently in force in NSW and that NSW will adopt NCC 2025 on 1 May 2027. Confirm the edition that applies to your construction certificate application with your certifier.
Are there good examples of adaptive reuse to learn from?
Adaptive reuse is not limited to housing. The Local Project recently featured NON's dance theatre in a transformed Sydney car park, a reminder that existing concrete structures can take on very different lives. Across NSW, many older commercial buildings in mixed-use and centre zones have been reworked into shop top housing or residential flat buildings, usually with the ground floor kept active for retail.
The common thread in successful projects is that the team tested the building before committing: structure, floor-to-floor heights, core location, façade and fire systems, mapped against the residential controls. Projects that skip that step tend to discover the deal-breakers after settlement.
Office-to-residential feasibility checklist
Before you buy or commit to an office conversion in NSW, work through these steps:
- Zoning: confirm residential flat buildings or shop top housing are permissible with consent under the LEP, and check height, FSR and any active frontage or employment floorspace controls.
- Pathway: if there is an existing consent, get advice on whether a section 4.55 modification is realistic or a new DA is needed.
- Building survey: obtain existing drawings, the fire safety schedule and annual fire safety statements, and a structural condition review.
- Floor plate test: sketch a typical floor with apartments that meet ADG daylight, ventilation and minimum apartment size objectives.
- Fire and BCA review: ask a BCA consultant or fire engineer what upgrades sections 62 and 64 are likely to trigger.
- Services: check riser locations, drainage falls and the capacity of water, sewer and electrical supply for residential loads.
- Acoustics and BASIX: confirm the floor and wall upgrades for NCC Part F7 and the measures needed to pass BASIX.
- Team: engage a registered design practitioner for Class 2 early, so the DA design can be carried through to regulated designs without redesign.
Our development due diligence and feasibility service covers these checks before you commit.
Frequently asked questions
Can a DA be modified to change use from office to residential?
Only if the modified development is still substantially the same development as originally approved under section 4.55 of the EP&A Act. A full change from office to apartments usually fails that test, so most projects need a new development application. Small changes within an existing mixed-use consent may be different, so get the consent reviewed.
What BCA class is an apartment?
Apartments are Class 2 under the NCC: buildings with two or more sole-occupancy units where people typically live above and below each other. Offices are Class 5. A converted building may end up with both, which makes it a mixed-use building with a Class 2 part under the DBP Act.
Is conversion cheaper than a new build?
It depends entirely on the building. Keeping the structure can save demolition and frame costs and time, but fire upgrades, new plumbing risers, acoustic work and façade changes can be significant. Only a building-specific feasibility study with cost advice can answer it. We do not quote generic figures.
Do I need a BASIX certificate for an office conversion?
Yes. Under the EP&A Regulation 2021, a change of building use by which a building becomes a BASIX building, meaning one with at least one dwelling, is BASIX development, so a BASIX certificate is needed for the DA.
Does the DBP Act apply if the building is only partly converted?
Yes. If any part of the building becomes Class 2, the DBP Act applies to building work on the whole building, including retained office or retail parts, unless a specific exclusion in the DBP Regulation applies.
Who can design an office-to-apartment conversion in NSW?
The regulated designs and design compliance declarations must be prepared by registered design practitioners. giantA is a NSW Registered Design Practitioner for Class 2 buildings under the DBP Act and works with structural, fire, services and acoustic engineers on conversions. Contact us to talk through a site.
Sources
- ABCB, Building classifications
- NSW Government, Building classes and roles under the Design and Building Practitioners scheme
- NSW Planning, Better apartments and Using the Apartment Design Guide
- NSW Planning Portal, Change of use (exempt development) and BASIX legislation
- NSW Planning, Building and subdivision certification: occupation certificates
- Environmental Planning and Assessment Regulation 2021, sections 62 and 64 and Schedule 7; Design and Building Practitioners Regulation 2021, clauses 12 and 13
- ABCB NCC Online, NCC 2022 Volume One Part F7
- The Urban Developer, Stalled Geelong Office Tower Waved Ahead with Apartment Refocus and Wrecking Ball Will Claim Older Offices as Seismic Shift Rocks CBDs
- The Local Project, NON's Dance Theatre Takes Place in a Transformed Sydney Car Park
This article is general information about NSW planning and building rules as at November 2026, not legal advice. Check current requirements with your council, certifier and the NSW Government before relying on it.